R-33-24 Accepting Change Order Number Two (2) New 1.5MG Elevated Water Storage Tank418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Accepting Change Order Number Two (2) New 1.5MG Elevated Water Storage Tank DATE: April 22, 2024 SUMMARY/BACKGROUND Change Order Request Number Two (2) for providing the electrical work necessary to the 1.5- million-gallon elevated water storage tank at a total cost of $64,100.00 is herein proposed. The electrical work needed to power the water storage tank has been included in the FY24 Budget. The proposed work will be added to the CB&I contract instead of bringing in a new contractor onto the project. Staff is working with ComEd to have the necessary work completed by ComEd to bring power to the site. There will be no cost for this part of the project. Attached are draft copies of the ComEd agreements that will be finalized when the transformer pad location has been updated. ANALYSIS Consistency with Village Policy Budget (if applicable) STAFF RECOMMENDATION Pass Resolution Accepting Change Order Number Two (2) New 1.5MG Elevated Water Storage Tank BOARD ACTION REQUESTED Pass Resolution Accepting Change Order Number Two (2) New 1.5MG Elevated Water Storage Tank ATTACHMENTS A Resolution Accepting Change Order Number Two (2) New 1.5MG Elevated Water Storage Tank.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R- -24 A RESOLUTION ACCEPTING CHANGE ORDER NUMBER TWO (2) NEW 1.5 MG ELEVATED WATER STORAGE TANK JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DAVE MAHER KEN MCCLAFFERTY KEVIN SHAUGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on ! ` z,024 RESOLUTION NO. R- 3 3 -24 A RESOLUTION ACCEPTING CHANGE ORDER NUMBER TWO (2) NEW 1.5 MG ELEVATED WATER STORAGE TANK WHEREAS the Village of Lemont recommends that Change Order Number Two (2) to install electric power to storage tank for the 1.5 MG Elevated Storage Tank project be accepted; and WHEREAS, the Village seeks to utilize the services of CB & I Storage Tank Solutions, LLC for such work; and WHEREAS, CB & I Storage Tank Solutions, LLC will provide and install a 200 amp single phase disconnecting ComEd approved meter socket and 4 inch PVC to ComEd pole with three (3) 3/0 awg XHHW cable pulled to pole for future connection by ComEd in accordance with Change Order Request Number Two (2) for the amount of $64,100.00. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: Change Order Request Number Two (2) to be completed by CB & I Storage Tank Solutions, LLC, 14105 S. Route 59, Plainfield, IL 60544 in the amount of $64,100.00 is hereby approved. SECTION 2: The Village President, Administrator, or Designee is hereby authorized to execute the agreement and to make minor changes to the document prior to execution that do not materially alter the Village's obligations, to execute any other agreements and documentation as well as to take any other steps necessary to carry out this resolution. SECTION 3: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS Z.-Z DAY OF ri 1 2024. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: ABSENT: ABSTAIN: Janelle Kittridge Dave Maher r! Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton JOHN EGOFSKE President ATTEST: CHARLENE A. SMOLLEN Village Clerk Q' �o v v 'Z AL EXHIBIT A Change Order Number Two (2) with attachments, Change Order Request (COR) Contract 162335 Contract 1.OMG Elevated Water Storage Tank — 12421 S. Archer Avenue No: Title COR No.: COR-004 COR Title: Power to 1.5MG Elevated Tank Date: March 13, 2024 Change Description: 1) Included the following: - Provide and Install 200amp single phase disconnecting ComEd Approved meter socket - Provide and Install 4" PVC to ComEd TX with [3] 3/0 awg XHHW cable pulled to TX for future connection by ComEd 2) Not included: - Unforeseen Code Compliant Issues - COMED Primary Direct Bore - Hand Hold for primary transmission line to tank - Permits and fees Attachments: 1. Exhibit 1-15-24 Received 1/16/24 via email. References: Price Effect: Original Contract Price: $ 5,298,000.00 Total Value of Previous Change Orders: $ 54,565.93 Value of this Change Order: $ 64,100.00 Revised Contract Price: $ 5,416,665.93 Work hours and Schedule Effect: CB&I was on track to meet final completion date of 11/30/2023 but unable for reasons beyond our control (power to site). New final completion date to complete remaining work will be as follows: 3 weeks after receipt of signed change order and 3 weeks after ComEd provides power to site to complete disinfection of tank and test system. If CB&I is delayed past 5/31/24 additional cost may apply. Prepared by: Signature: Position: Project Manager Printed Name: Brett Keller Date: March 13, 2024 For Contractor: For Company: Authorized Signature: Authorized Signature: Printed Name: Brett Keller Printed Name: Position: Project Manger Position: Date: Date: f2 00 w E f m� to �vvv v rrrrrrr *b\ wwt ea��\u5iaalz:..l KOZ L Yltl IZ�OS�OI 6LOZ/St/l EXHIBIT B ComEd SER Agreement Draft JOLIET OFFICE 1910 SOUTH BRIGGS STREET JOLIET, ILLINOIS 60433 847-921-7767 VILLAGE OF LEMONT 1153 STATE ST LEMONT, IL 60439 Dear VILLAGE OF LEMONT, An �xeaon Company Date: 04/10/2024 Enclosed are the documents related to the supply of electricity at 1153 STATE ST, LEMONT, ILLINOIS. Please sign all copies of the enclosed documents and two copies of the Service Entrance Location Sketch. The third copy of the sketch is for your use during Construction. Return the signed documents and sketches and payment of $0.00 to my attention. If this contract is not returned within 30 days, it will be cancelled. Upon receipt of your payment and signed copies, Commonwealth Edison will begin to schedule any necessary service work. An authorized copy of each document will be returned to you for your files. You may make payments on the ComEd website or by phone. A $5.95 Paymentus Corp. convenience fee will apply to each electronic payment transaction. By Internet go to: httr)s://www.comed.com/MvAccount/MvBillUsage/Pages/PavMvBill.aspx (for payments of $5,000 or less for Credit/Debit) (for payments of $90,000 or less for eCheck) Or By Phone, Call (English & Spanish) 1-800-334-7661 (for all payments of $5,000 or less: Credit, Debit and eCheck) 1-800-588-9477 (for all payments of $5,000 or less: credit, Debit and eCheck) Or By Customer Service Representatives 1-800-334-7661 (for payments of $5,000 or less for Credit/Debit) 1-800-334-7661 (for payments of $90,000 or less for eCheck) If you have any questions concerning this contract please contact your Field Representative. Enclosures Sincerely, DEVIN GLOVER ENGINEER DESIGN TECH 847-921-7767 ELECTRIC FACILITIES SERVICE ACKNOWLEDGEMENT PL#: 475273 ESS: YES SER#: SJ240074 Rev.: 00 VILLAGE OF LEMONT (the "Customer") hereby acknowledges the terms and conditions under which Commonwealth Edison Company (the "Company" or "ComEd") is providing electric facilities and equipment to serve the Customer's premises located at 1153 STATE ST, LEMONT ("Premises"). 1. Preamble. The Company will furnish, install, own and maintain, and the Customer will pay the Company for, the electric facilities and equipment described herein pursuant to the terms and conditions set forth herein and in accordance with the terms of the Company's Rate RDS - Retail Delivery Service ("Rate RDS"), Rider NS - Nonstandard Services and Facilities ("Rider NS"), Rider ML - Meter -Related Facilities Lease ("Rider ML"), Rider ZSS - Zero Standard Service ("Rider ZSS") as applicable, and with the General Terms and Conditions ("GTC") stated in the Company's Schedule of Rates, as they may be amended from time to time. In the event of any conflict between the terms of this Acknowledgement and the terms of the Company's tariff, the latter will prevail. 2. Service Points. The Customer is to receive delivery of electric power and energy at the Premises from the Company at an estimated total maximum demand of 45 kilowatts ("kW") ("Maximum Kilowatts Delivered" or "MKD") at the following location(s) (as shown on Exhibit A attached hereto) and in the following amounts and approximate voltages during the Retail Peak Period, as defined in GTC. Loc. 001 est. demand 45 kW, metering voltage approx. 120/208Y volts, 3 phase, 4 wire 3. Charges; Rental. 0 The Company will furnish, install, own and maintain, under the terms and conditions set forth below and in accordance with the terms of the Company's Rider NS and Rider ML, the facilities and equipment listed in the Facilities Rental Service and Meter Lease Service attachments to this Acknowledgement. The facilities and equipment listed in such attachments, together with any conductors, cables, supports and related equipment installed by the Company, and any replacements or adjustments thereof, are hereinafter called the "Facilities". Such Facilities are or may be located on the Premises. (i) The Customer's estimated maximum demand during Retail Peak Periods set forth above is used to determine the service facilities that are available to the Customer as a standard installation under the applicable tariffs. The estimate of the Customer's MKD set forth in Section 2 above is based upon information provided to the Company by the Customer and the Customer agrees that this estimate is representative of the Customer's expected operation, demand and consumption. Load defined as "Zero Standard Portion" under Rider ZSS is not included in the determination of the estimated maximum demand shown above because a standard installation is not provided for the Zero Standard Portion of load. (ii) Such standard service facilities are subject to change from time to time based upon the Customer's actual MKD in accordance with the provisions of the Company's Rate RDS, Rider NS and GTC, or their successors. If the Customer's actual MKD is less than the amount of kW set forth in Section 2 above, the Company may remove, replace, or adjust the Facilities at the Customer's expense so as to provide the Customer the standard installation facilities as provided in Rider NS or to adjust the rental as provided in Section 3(c). (iii) If the Customer desires to add load beyond the levels set forth above in Section 2 or to increase capacity at an individual point of service, the Customer shall notify the Company, in writing, adequately in advance of adding such load or increasing such capacity so that the Company may modify its facilities as determined by the Company. c. The initial monthly rental specified in the Facilities Rental Service attachment is based on the Company's standard rental charges applicable on the date the Facilities were installed or last revised and is subject to change as provided herein or in Rider NS. d. The monthly rental charges for the Facilities are in addition to all other charges under (i) other applicable tariff provisions and (ii) any additional charges imposed by the Company on account of special installation requests or requirements or requests by the Customer for maintenance beyond the level set forth in Section 5(c). e. The Customer shall pay all taxes applicable to the Company's provision of the Facilities and other services to the Customer (including without limitation all applicable federal, state, regulatory, municipal and other taxes with respect to customer charges and rentals). 4. Ownership; Access; Other Company Rights. The Facilities will remain the sole and exclusive property of the Company. The Company may, in its sole discretion, affix to the Facilities (or any parts thereof) labels or other markings indicating the Company's ownership of the Facilities. The Customer does not acquire any interest in the Facilities (or any parts or components thereof). Use by the Customer of the Facilities does not divest the Company of its exclusive rights to such ownership, use and possession. The Customer will, upon the request of the Company from time to time, execute and deliver to the Company all documents reasonably necessary or advisable to confirm, perfect or evidence any rights of the Company in and to the Facilities. b. The Company and its representatives will have free access to the Premises at all reasonable times (and immediately at any time if an emergency exists) for the purposes of inspecting, protecting, installing, operating, maintaining, repairing, altering, replacing, relocating or removing any of the Facilities. ComEd has the right to install facilities on the Customer's property to provide electric service to the Customer and to other users of the Facilities. The Company may, in its sole discretion, replace, remove or alter any part of the Facilities, add or remove portions or components of the Facilities or revise any procedures with respect to the Facilities. Any such replacements, substantial alterations, or additions of or to the Facilities will belong to and be property of the Company and shall be a part of the Facilities. c. Such inspection, protection, installation, operation, maintenance, repair, alteration, replacement, relocation and removal will be in accordance with, and at the time(s) and at the standards prescribed by, the Company's standard practices and procedures for the types or classes of each of the Facilities. If the Customer requests maintenance beyond this level, the Company may impose an additional charge for such additional maintenance. 5. Customer Responsibilities. The Customer will not move, remove, modify, alter, adjust or change in any way the Facilities or any part thereof without first obtaining the written consent of the Company, except to protect the Premises or any person from damage or injury during any emergency or except and to the extent provided in a separate written agreement. Except to the extent set forth in the prior sentence, the Customer will not permit anyone other than the Company, or the Company's respective representatives, agents or subcontractors to effect any inspection, adjustment, preventative or remedial maintenance, repair, overhaul, replacement or removal of the Facilities. b. The Customer shall at its sole cost and expense: (i) provide to the Company such working space within a reasonable distance of the Facilities as specified by the Company and take such other steps as are necessary to allow the installation, construction, maintenance, repair, alteration, replacement and removal of the Facilities to be readily and efficiently performed; (ii) keep the Facilities on the Premises free from any over -building or other obstruction that might create an unsafe condition or that might interfere with the Company's ability to install , operate, maintain, repair, alter, replace or remove the Facilities; (iii) provide and maintain in a good, safe and proper state of repair, the Premises and all other property furnished by the Customer in connection with the Facilities; (iv)furnish, install and maintain the wiring, supports, and other appurtenances, as specified by the Company, necessary for the Facilities; (v) if the installation of the Facilities includes or requires a vault or ground -type installation, furnish and maintain the enclosure, foundation, fill, required ventilation, and similar facilities in accordance with the Company's specifications, standards, rules and regulations; (vi) make use of the Facilities in accordance with the Company's specified practices and procedures and protect the Facilities from harm, theft or misuse and deterioration (except for reasonable wear and tear resulting only from proper use thereof); and (vii) notify the Company by telephone promptly after the Customer first has knowledge of (i) any malfunction in operation of the Facilities; (ii) any interruption or alteration of electricity delivery to the Premises; (iii) any alteration or modification in the Facilities or its operation which is not initiated by Company, and (iv) any emergency or dangerous condition affecting the Facilities. c. If any part of the Facilities is lost, stolen, condemned, confiscated, damaged, destroyed or needs maintenance, repairs or replacement due to an act, error, omission, breach, negligence or willful misconduct of any employee or other agent of the Customer, the Customer shall be obliged to reimburse the Company promptly for the Company's customary time and materials costs of the maintenance, repair and replacement of the Facilities. If any part of the Facilities is lost, stolen, condemned, confiscated, damaged, destroyed, or needs maintenance, repairs or replacement due to an act, error, omission, breach, negligence or willful misconduct of one or more employees or other agents of both the Company and the Customer, the Company shall repair or replace such part of the Facilities, and the cost of any such repair or replacement shall be shared by the Customer and the Company in proportion to their respective degrees of fault. 6. Removal. Upon termination of the provision of service to the Customer, the Company at its option may, and upon the Customer's request the Company will, remove all or any part of the Facilities. The Customer will bear the cost and expense of such removal. 7. Relocation. If relocation of all or any part of the Facilities is requested by the Customer or there is a change in the Customer's operation or construction, which in the judgment of the Company, makes such relocation necessary or advisable, the Company will move such facilities at the Customer's expense to a location on or adjacent to the Premises mutually acceptable to the Company and the Customer. 8. Miscellaneous. a. The listing of the Required or Requested Facilities in the Facilities Rental Service attachment and the monthly rental may be modified from time to time upon oral or written notification to the customer (and the removal or installation of any such Facilities shall constitute prima facie evidence of such notification). b. The Company may adjust the Facilities or the monthly rental if the Customer's actual MKD is more or less than the level set forth in Section 2 above. c. The Company may adjust the monthly rental as provided in Section 3(c)/4(g) and in the Facilities Rental Service attachment. 9. Safety. Be advised that safety on the job site is the responsibility of the Customer and Customer's contractor. The Occupational Safety and Health Administration (OSHA) requires a specific clearance when working near energized primary electric lines. Consider all electric wires to be energized and non -insulated. Workers may be electrocuted or seriously injured by contact with the power lines or while working in close proximity to those lines. All workers and equipment must maintain a safe distance from the power lines at all times. The Customer or Customer's contractor should not commence work near ComEd's lines until such time that temporary protective measures have been taken to guard against danger of incidental contact. Consult OSHA guidelines for more specific information when working near or around energized electrical equipment. (See www.osha.gov <http://www.osha.aov>.) Contact 1-800-EDISON-1 for questions concerning working in proximity to ComEd electrical facilities. Clearance of electrical equipment from permanent structures is governed by the National Electrical Safety Code (NESC). Reference the National Electrical Safety Code for specific information. ComEd is very concerned about the safety of its customers and others working around its facilities. Compliance with OSHA and the NESC is a requirement. Please ensure that the activities undertaken by the Customer or Customer's contractor include the safe work practice of maintaining the required working clearances and required vertical and horizontal clearances from permanent structures. The undersigned Customer acknowledges he/she has read the foregoing safety statement and agrees to comply with all state, federal and local safety requirements and shall require any contractor working in proximity to ComEd equipment to acknowledge and agree to same. 10. Customer/Owner Acknowledgement. The undersigned Customer acknowledges the terms noted herein. In case the Customer is not owner of the Premises, the undersigned property owner hereby acknowledges and agrees to the terms noted herein. Account Number: 1574692222 FOR THE CUSTOMER: SER No.: SJ240074 Work Task Number: 1921883701 Customer Name Accepted By Signature ok R a 144e Print Name WMO' Official Capacity d Title P 4riy Owner's Signature FACILITIES RENTAL SERVICE - RIDER NS S.E.R. #: SJ240074 The Company hereby agrees to furnish and maintain hereunder facilities which the Company provides on a rental basis, for which the Customer agrees to pay a monthly rental of $0.00 as described below: 1. Required Transformer Facilities: Transformer Number: 475273G5 @ 120/208Y 1 - 75 KVA-COMP FEED-THRU TRANS, 12470-120/208 VOLTS, PAD MOUNT @ 82.57 $82.57 (FPN430075) 3 - 15 KV - DISTRIBUTION CLASS ARRESTER @ 0.41 (2A5) $1.23 3 - 15KV - 100 AMPERES, CUTOUT, OPEN TYPE @ 0.38 (1A3) $1.14 Total $84.94 2. Standard Transformer Facilities: 1 - 75 KVA-COMP FEED-THRU TRANS, 12470-120/208 VOLTS, PAD MOUNT @ 82.57 $82.57 (FPN430075) 3 - 15 KV - DISTRIBUTION CLASS ARRESTER @ 0.41 (2A5) $1.23 3 - 15KV - 100 AMPERES, CUTOUT, OPEN TYPE @ 0.38 (1A3) $1.14 Total $84.94 3. Additional Required Facilities: Total $0.00 4. Additional Standard Facilities: Total $0.00 5. Frozen Transformer Rental: $0.00 6. Monthly Transformer Rental: $0.00 (item 1 minus item 2, minus item 5) NOTE: if this value is less than zero, this line item will be changed to zero 7. Monthly Switchgear Rental: $0.00 (item 3 - item 4) NOTE: if this value is less than zero, this line item will be changed to zero 8. Capacitor Facilities: $0.00 0@$0.17 9. Total Monthly Rental: $0.00 (item 6 + item 7 + item 8) All such facilities shall remain property of the Company. The monthly rental specified is based on the Company's standard rental charges applicable on the date hereof and is subject to change. The actual rental charges shall be those in effect at the time of the installation of the facilities; and whenever there is a change in facilities which require a different rental payment, the rental charge for all facilities of the same class will be based on charges in effect at that time. The monthly rental is in addition to all other charges under the contract to which this rider applies. Customer Name: VILLAGE OF LEMONT Address: 1153 STATE ST, LEMONT Dated: 04/10/2024 METER LEASE SERVICE - RIDER ML S.E.R. # : The Company agrees to furnish and maintain on the Customer's premises metering equipment in excess of a standard meter allowance to measure the electricity supplied to the Customer, as described below, for which the Customer agrees to pay a total monthly meter lease amount of �� Total Required: 2. Standard Meter Allowance: 3. Total Monthly Meter Lease: (item 1 minus item 2) The Customer agrees to furnish and install the wiring, supports, and other appurtenances, as specified by the Company, necessary for the metering installation or installations. The monthly meter lease specified above is subject to change and is in addition to all other charges under the Company's tariffs. The Standard Meter Allowance is a dollar amount that represents the average rental value of a standard one meter installation for most delivery classes. The Extra Large Load Delivery Class (Over 10 MW) has a Standard Meter Allowance of two meters. Customer: Dated: An Exelon Comparry Twe of Pavment Agreement Date : 04/10/2024 Phone Number: 847-921-7767 Check ❑ Name :VILLAGE OF LEMONT Service Address : 1153 STATE ST City, State : LEMONT, IL Wire/ACH ❑ Submitted by : DEVIN GLOVER Group SER Pa ment S.E.R. #: SJ240074 CIMS Account # Work Order Task # Total 1574692222 1921883701 $0.00 \ Z� | E < / * / § z k � k of 0 � \ \ \ z .\ 2 ¥ o _z [ § / Q m / « z «® s/ ZOW $ «}) — */§\/ \} c2 (LL $ O ¥< 2 r� 2/ «LL 0w2 2 2§± o , c/\2c >� ramƒ 2$ 6 «oe § /O\\< uc e �§ R eo C) / e ®/\/ ALL§ § 2200 �)o �22/ k\\2 LU �9W� 0\oCLw °°%»±°®° �\\) �I�w� o /)I w /\I\b §/k #)�)§ CJR 2&/R@ a^ �^ EXHIBIT C ComEd SES Agreement Draft iD comeds" AN EXELON COMPANY Service Entrance Specifications SER #: SJ240074 REV:O Prepared for: Village of Lemont — Water Tower Archer Ave & Derby Road Lemont, IL This information is for the customer, electrical contractor and architect. Class of Business: Switch Size and Type: Service Voltage: Proposed Connected Load: Estimated Maximum Demand: Small Commercial 400A Underground Service 120/208 V, 30, 4-Wire Y-Connected 68 kW 44 kW The maximum available short circuit current at the customer's bus for this plan is 12,245 Amps at 208 V (RMS symmetrical). Any future transformer changes may result in an increase in available short circuit currents without notice. The ultimate short circuit current for the largest available transformer for the specified pad C5293.A is 81,650 amps at 208 V (RMS symmetrical). The maximum size transformer for the pad specified is a 500 kVA. Service location given is for the load shown above. Any change in load may require a change in location. All installations must conform to the Commonwealth Edison Company "Information and Requirements for the Supply of Electric Service". This service plan is contingent upon ComEd receiving all required permits and/or easements. The customer or the electrical contractor shall secure the approval of the appropriate governing authority. In localities where governing approval is required, ComEd will connect the service only after receiving such approval. Acceptance as indicated below is for all pages of this document and attachments. Any additions, deletions, or revisions to this document and/or attachments must be approved by both parties by initialing & dating such items, and may result in additional customer charges and/or construction delays. FOR THE COMPANY: Prepared by: Devin Glover PHONE: 847-921-7767 DATE: 04/10/2024 Accepted By (ComEd Signature) FOR THE CUSTOMER: (Company Official, Consultant, or Architect) x -2Z-N A cepted By: Date (Customer Signature) X Print Name XOA"Vil Official Capacit comed=" AN EXELON COMPANY Service Entrance Specifications SER #: SJ240074 REV:O CUSTOMER IS RESPONSIBLE TO: 1. Locate and stake all NON-J.U.L.I.E. underground facilities in proposed work area that would hamper or be subject to damage by digging operations. Any damage resulting from failure to properly locate and stake such facilities shall be the responsibility of the customer. 2. Ensure that the work area is free and clear of all obstructions with grade not above, nor more than 4" below final grade. ComEd will not work where rock, concrete, or other obstructions exist. If abnormal soil conditions are encountered, customer must provide trench and clear fill, or pay ComEd for the additional costs incurred. The trench route must be at least 10' wide, and have not more than a 4:1 slope. 3. Restore the work area. This includes, but is not limited to, repairs and/or replacements of trees, shrubs, pavement, sod, etc. resulting from the installation, repair, or replacement of ComEd facilities on customer property. 4. Install, own, and maintain concrete transformer foundation, either poured or precast, per ComEd specification C5293.A and C5285. Pad is to be oriented per the attached sketch (where the base of the triangle indicates the front of the transformer). A ten feet clear space is required in front of the transformer doors for operation and maintenance. Transformer must be placed minimum of 5' to the side of any door or window. 5. Install, own, and maintain all associated conduit bends at transformer pad as indicated on the attached sketch. Terminate primary and secondary conduits flush with the top of the foundation. After conduits are in place, back fill with screenings, sand, or fine excavated material. Compact thoroughly before placing aggregate and pouring foundation. Top of foundation shall be smooth and level. 6. Contact the ComEd representative at 847-921-7767 for inspection of foundation framing and reinforcement at least 48 hours prior to pouring concrete. 7. Install 1" conduit and trench for ComEd ground wire per applicable transformer pad specification. 8. Install, own, and maintain conduits (4" PVC schedule 40, or rigid steel pipe) at a minimum depth of 30" below final grade for ComEd primary cable, as shown on the sketch, and beneath any paved areas & sidewalks. All bends to be Galvanized rigid steel conduit, with a 36" minimum bend radius. Total of all bends in conduit run not to exceed 270°, or 650' between pulling points. Conduit bends at poles to be terminated above grade, but no more than 3' above grade. Customer to check conduit with a wire mandrel, install'/4" comed'" AN EXEION COMPANY Service Entrance Specifications SER #: SJ240074 REV:O polyethylene pull line in conduits, seal ends, and mark end locations above ground with a stake. 9. Install, own, and maintain secondary cable and conduit to ComEd transformer(s). Furnish secondary lugs and connect secondary conductors at metering facilities and service disconnect. Cable to be sufficient length to reach the secondary connections of the transformer(s). Exact route is customer's option. 10. Inform ComEd of size, composition, and number of secondary cables and ensure cables meet the appropriate governing authority specifications. 11. Install, own, and maintain CECHA approved meter fitting outdoors, and secure inspection approval from the local regulating body, prior to connection by ComEd. 12.Install the metering current transformers (CT's), that ComEd supplies and delivers to the job site. Provide and install any spacers required to accommodate the installation of the CT's. 13. Install CT wiring harness. All wiring harness wires are to be copper wire only. 14. Customer to acquire meter inspection approval at least 10days prior to the anticipated date of energization. This lead-time is required to schedule ComEd Ct/Meter installation, and secondary cable termination. 15. Balance single-phase load evenly on all three phases. 16. Customer to install, own, and maintain underground secondary service cable and conduit to W quadrant of ComEd pole, as indicated on the attached sketch. Customer to coil sufficient cable at base of pole to extend to transformer. If cable is installed in conduit, install bend against base of pole, with a minimum of 3' of conduit extending above finished grade. 17. Withstand self-induced flicker. Where any of the customer's utilization equipment has characteristics which, in the company's judgment, may cause interference with service to other customers or result in operation at a low power factor, the customer shall at the request of the company, provide suitable facilities to preclude such interference or improve such power factor, or both, as the case may be. Otherwise, the company shall have the right to provide, at the expense of the customer, the facilities necessary to preclude such condition(s). 18. Please share this information with you electrician to ensure the installation meets ComEd service requirements. comeds" AN EXELON COMPANY Service Entrance Specifications SER #: SJ240074 REV:O COMED IS RESPONSIBLE TO: 1. Inspect and approve transformer foundation after framing is complete and prior to pouring. 2. Install, own, and maintain 75 kVA 120/208V, 30 4-wire transformer on customer's pad, terminate primary and secondary cables at transformer, and liven. 3. Install, own, and maintain all underground primary cables as shown on sketch. 4. ComEd to wire CT's and install meter after governing authority inspection and approval of metering cabinet. 5. Furnish standard size lugs and connect customer owned secondary cable at transformer after receiving inspection and approval notification from the appropriate governing authority. (Please allow 10 working days after switch inspection and approval for final connection.) OTHER NOTES: 1. These charges, if any, are contingent upon the work being performed as specified in this document. Changes or revisions could affect the charges. Plan is void if not accepted within 30 days of document date. 2. All ComEd charges associated with these specifications are for ComEd work only. There may be additional charges required by other utilities or communication companies. They should be contacted for their associated charges, if any. 3. This plan and/or charges are contingent upon ComEd obtaining all necessary permits and/or easements on and off customer property. 4. All metering cabinets rated less than 1200 amps and the associated equipment shall be installed outdoors, be accessible to ComEd, and be inspected and approved by the appropriate governing authority prior to connection by ComEd. 5. Please be aware that ComEd's System Meter Department must approve the installation of main electrical panels that are rated greater or equal to 1,200 amps & any service that is greater than 600 volts. To obtain approval: (1) a pdf of the one -line diagram for the meter current transformer cabinet and disconnect switch sequence can be emailed to SWBD.APProvals()ComEd.com (please copy your field representative) or (2) four physical copies can be submitted to ComEd: System Meter Department at 1919 Swift Drive, Oak Brook, IL 60523. J comeds" AN EXELON COMPANY Service Entrance Specifications SER #: SJ240074 REV:O 6. Please be sure to include the electrical panel's manufacturer and model number. These diagrams may be found in your project's electrical plans or in the manufacturer's specifications for the panel. Talk to your electrical contractor if you need assistance acquiring these documents, and be sure to allow ComEd ample time to receive and review these items. The switchboard cannot be energized until these drawings have been approved by ComEd and inspected by the appropriate governing authority. 7. Customer approves of ComEd equipment location. The customer must not change grade, overbuild, or pave upon ComEd easements, or facilities routes, after installation. Any relocation or modification of ComEd facilities due to flooding, settling, future developments, etc..., will be at the customer's expense. 8. The required work will be scheduled and performed as outlined above after the 'Service Entrance Specifications' and 'Electric Facilities Service Agreement' are signed and returned to ComEd. Site must be to grade before work can begin. 9. ComEd's inclement weather clause states that scheduled construction will not take place in the event of rain, snow, sub -zero temps, etc... 10. Customer is required to contact ComEd if anticipated load is expected to exceed 75KW at any time. ComEd cannot guarantee uninterrupted service if customer's load exceeds the stated amount. Customer may be liable for any damages caused by overloading the ComEd system. comed " AN EXELON COMPANY Service Entrance Specifications SER #: SJ240074 REV:O Pre -cast foundations available as an alternative to poured -in -place foundations for the following Construction Standards: C5286, C4288, C5289, C5290, C5293, C5296, C5297, C5298, C5299, C5302, and C5303. Listed below are the current 2006 approved suppliers of pre -cast transformer foundations. The customer may elect to utilize a pre -cast foundation from one of the approved suppliers, it is the customer's responsibility to negotiate all commercial terms and conditions such as: price and delivery. SUPPLIERS for TRANSFORMER FOUNDATIONS: Eller & Willey Block Co. 649 Palmyra Road c/o Dixon, IL 61021 1478 Phone 815-284-7761 Craft Concrete Products, Inc. (note 1) 134 South Highway 14 Cary, IL 60013 Phone 847-639-7411 fax:847-639-7511 Utility Concrete Products Co. 2495 W. Bungalow Road Morris, IL 60450 Phone 815-416-1000 Welch Bros., Inc. 105 St. Charles Street Elgin, IL 60120 Phone 847-741-6134 Unit Step Company, Inc. (note 2) 1515 Channahon Road (Rt. 6) Joliet, IL 60436 Phone 815-744-1263 Concast, Inc. Electro Tech, Inc. McCormick Pl. Wheaton, IL 60187 Phone 800-544-4288 Local 630-668-0630 Raspolich Material Company 401 N. West Avenue Kankakee, IL 60901 Phone 815-932-7491 Note 1: Will not supply C5302 foundations Note 2: Will not supply C5302 or C5303 foundations SUPPLIERS FOR SWITCHGEAR FOUNDATIONS: Concast, Inc Nordic c/o Electro Tech, Inc. 1478 McCormick PI 969 Wheaton, IL 60187 Phone 800-544-4288 Local 630-668-0630 Fiberglass , Inc Haverstock, Bowers & Assoc Keystone Way, Suite 110 Carmel, Indiana 46032 Phone 317-848-5127 comed AN EXELON COMPANY Service Entrance Specifications SER #: SJ240074 REV:O SKETCH SYMBOLS p EXISTING POLE (HALF SHADED e INDICATES IBT 112 OWNERSHIP) (© INDICATES CUSTOMER OWNED POLE) PROPOSED POLE ❑ EXISTING POLE TO BE REPLACED -- EXISTING DOWN GUY AND ANCHOR I PROPOSED DOWN GUY AND ANCHOR REMOVAL SYMBOL — - - - — EXISTING OVERHEAD PRIMARY CIRCUIT (DASHES INDICATED # OF PHASES) — - - - — PROPOSED OVERHEAD PRIMARY CIRCUIT { EXISTING POLE MOUNTED TRANSFORMER PROPOSED POLE MOUNTED TRANSFORMER POLE MOUNTED TRANFORMERTO BE REPLACED p EXISTING CABLE TERMINAL POLE (DOWN FEED) PROPOSED CABLE TERMINAL POLE (DOWN FEED) EXISTING SERVICE DROP OR SECONDARYAERIAL CABLE e PROPOSED SERVICE DROP OR SECONDARY AERIAL CABLE EXISTING OPEN WIRE SERVICE DROP OR SECONDARY - - - — EXISTING UNDERGROUND PRIMARY CABLE (DASHES INDICATE PHASES) t- - - - — PROPOSED UNDERGROUND PRIMARY CABLE EXISTING UNDERGROUND SECONDARY OR SERVICE CABLE PROPOSED UNERGROUND SECONDARY OR SERVICE CABLE EXISTING PAD MOUNTED TRANSFORMER (BASE OF TRIANGLE = FRONT) m PROPOSED PAD MOUNTED TRANSFORMER ® PAD MOUNTED TRANSFORMER TO BE REPLACED ( CABLE PROTECTION TUBES OR CONDUITS SPLICE PIT g EXISTING METER ENCLOSURE All, PROPOSED METER ENCLOSURE --emmio Z4i%� O Z W Uj p O OJ C ) � ¢z� W o YF- � LL o U 0000- 0z NNO U= ~OUNU� Y� ❑ O ¢ p 0 0 �e W >- w» LL U O ❑ Yr,� w 1=3w ¢ ¢ O- J z — W a M � J 2 W d0cc)2 a¢C7 LL � ¢Oa0Q zpz I -ZHd)� F�- zDzZz 0 LM � W N P M O O w O W 0 U) V �EOf 0 W r ,= `/ U c AU Q W Z �mi z uj O a - Cr� [-- LLLJ O O �-- LLJ 3: C) J U) ZO (W oK xz W � � "I w wC�j w a a 0 Z � U Q W ZQ n a7w�� � W fW () co W W LL ci W U d Nw0f LL--LL W 0 �WzpUZ W OLL UI— Q O z r")\ Q Q O Z w 0 Q O LLI N O Z 0 0 W —< C) �aNU¢a�ww-iLLM �- 0 � 0 0 LLJ JCS �w F-H—Ug>�¢= Up v^¢ W 0LL in � QMFJ2waaW2J¢�m�wW z0 .*k p Q Qui FLLF- MU cn U) O mwoKNg¢omw W=d'WL) c�-UNI—M0�(nLL0�U DERBY ROAD 0 0 W/ VJ � Z _ Op aJ_ �D a 00 w� aw aja �wz ww FNw F ?j, w oZ' O.o. y » O U wow wo V � W W o H ao.u oT yo